Maskwa Engineering Ltd.

Information and History

Alternate names:
  • Maskwa Engineering Ltd.
Location(s) (based on BIP Registry and Contract Reports):
Address(es) (based on BIP Registry):
Search GNWT BIP Registry: Link
Search NWT Corporate Registry: Link

Published Contracts

Summary of Total Published Contracts
Type # of Contracts Value of Contracts
Competitive Contracts (Published in Contracts Over $5k Reports) 10 $237,288.26
Contracts under Exisiting Standing Offer Agreement 0 -
Sole Source Contracts 39 $682,721.75
Negotiated Contracts 0 -

Contract History
Fiscal Year Dep't Procurement BIP Status Process Type Company Location Original Amount Change Orders Final Amount
2018-19 INF Merlyn Carter Airport Surficial Drainage - Request for Proposal $86,194.00 0 -
2014-15 PWS Engineering work re AIrports Maintenance BIPed Sole Source procurement Yellowknife $7,610.00 0 $7,610.00
2014-15 PWS ESA Ph2 & Ph1 Investigation for lots #24 BIPed Sole Source procurement Fort Smith $10,400.00 0 $10,400.00
2014-15 PWS Site Investigation-Fort Resolution,NT - BIPed Sole Source procurement Fort Smith $10,400.00 0 $10,400.00
2014-15 PWS College Underground Monitoring BIPed Sole Source procurement Fort Smith $11,000.00 0 $11,000.00
2014-15 PWS Dory Point Day Use Shelter Replacement BIPed Sole Source procurement Hay River $6,700.00 0 $6,700.00
2014-15 PWS Hay River Territorial Park Loop C Extens BIPed Sole Source procurement Hay River $21,580.00 0 $21,580.00
2014-15 PWS Structural Evaluation- Thebacha College BIPed Sole Source procurement Fort Smith $6,140.00 0 $6,140.00
2013-14 DOT Trout Lake Airport relocation BIPed Sole Source procurement Hay River $6,205.00 0 $6,205.00
2013-14 DOT Quality Control for Runway Repairs BIPed Sole Source procurement Hay River $24,960.00 0 $24,960.00
2013-14 DOT Trout Lake Airport Quality Control BIPed Sole Source procurement Hay River $19,905.00 0 $19,905.00
2013-14 DOT Geotechnical Services BIPed Sole Source procurement Hay River $23,100.00 0 $23,100.00
2012-13 DOT Geotechnical Services BIPed Sole Source procurement Hay River $7,270.00 1 $13,830.00
2012-13 DOT Highway 5 Survey Services BIPed Sole Source procurement Fort Smith $23,250.00 1 $31,537.50
2011-12 DOT Concrete Testing BIPed Sole Source procurement Hay River $21,000.00 2 $27,520.00
2011-12 PWS Thomas Simpson & Bompas Schools Topographic Surveying BIPed Request for Tenders Hay River $9,800.00 0 $9,800.00
2010-11 DOT Engineering Services - Quarry Management BIPed Sole Source procurement Hay River $20,000.00 0 $20,000.00
2010-11 PWS Deline School - Site Drainage - Surveyin BIPed Sole Source procurement Hay River $14,240.00 1 $16,685.67
2010-11 PWS Deline School - Site Drainage - Surveyin BIPed Sole Source procurement Hay River - 2 $10,081.16
2009-10 DOT Provision of Quality Control Services BIPed Sole Source procurement Hay River $25,000.00 0 $25,000.00
2009-10 DOT Provision of Quality Control Services BIPed Sole Source procurement Hay River $25,000.00 0 $25,000.00
2009-10 DOT Provisioin of Quality Control Services BIPed Sole Source procurement Hay River $25,000.00 0 $25,000.00
2009-10 DOT Provision of Quality Control Services BIPed Sole Source procurement Hay River $25,000.00 0 $25,000.00
2009-10 DOT Provision of Quality Control Services BIPed Sole Source procurement Hay River $25,000.00 0 $25,000.00
2009-10 DOT Provision of Quality Control Services BIPed Sole Source procurement Hay River $22,000.00 0 $22,000.00
2009-10 DOT Quality Control Services BIPed Sole Source procurement HAY RIVER $25,000.00 1 $55,000.00
2009-10 DOT Quality Control Services BIPed Sole Source procurement Hay River $25,000.00 0 $25,000.00
2009-10 PWS Twin Falls Campground Loop BIPed Sole Source procurement Hay River $14,800.00 0 $14,800.00
2009-10 DOT Quality Control & Surveying Services BIPed Sole Source procurement HAY RIVER $16,385.00 0 $16,385.00
2008-09 PWS Survey and assessment report BIPed Sole Source procurement Hay River $7,383.67 0 $7,383.67
2008-09 DOT Survey Hay River Reserve Road BIPed Sole Source procurement HAY RIVER $7,000.00 0 $7,000.00
2008-09 DOT Quality Control & Surveying Services BIPed Sole Source procurement Hay River $27,695.00 0 $27,695.00
2008-09 DOT Topographic Surveying-Various Culvert Sites BIPed Request for Tenders Hay River $74,500.00 1 $87,219.50
2007-08 PWS Chief T'selehye School Topographic Survey BIPed Request for Tenders Hay River $10,200.00 0 $10,200.00
2007-08 DOT As And When Pit/Stockpile Survey, Design Modification and Quantity Calculations BIPed Request for Tenders Hay River $22,914.08 1 $24,838.65
2007-08 PWS Princess Alexandra School Drainage BIPed Request for Proposals Hay River $20,295.00 0 $20,295.00
2007-08 PWS Princess Alexandra School Drainage BIPed Request for Proposals Hay River - 1 $7,008.11
2006-07 DOT Pit Surveying and calculation of Gravel BIPed Sole Source procurement HAY RIVER $14,148.75 0 $14,148.75
2007-08 DOT Fort Smith Airport Sewage System Study BIPed Request for Proposals Hay River $12,310.00 0 $12,310.00
2005-06 DOT Quality Assurance BIPed Sole Source procurement Hay River $6,275.00 1 $6,970.00
2005-06 PWS Nats'ejee K'eh Foundation Monitoring BIPed Sole Source procurement Hay River $8,600.00 0 $8,600.00
2005-06 PWS Chief Sunrise School Concrete Test, Samp BIPed Sole Source procurement Hay River $8,400.00 1 $12,450.00
2013-14 PWS Fort Resolution Maintenance Shop Geotech BIPed Sole Source procurement Fort Smith $8,275.00 0 $8,275.00
2008-09 PWS Topo Survey - ENR Fuel Containment BIPed Sole Source procurement Hay River $6,010.00 0 $6,010.00
2009-10 NWTHC Engineering Services BIPed Sole Source procurement Hay River $8,940.00 0 $8,940.00
2009-10 ENR Wood Marshalling Yard Model BIPed Request for Proposals Hay River $34,187.00 0 $34,187.00
2008-09 NWTHC Geotechnical Services BIPed Sole Source procurement Hay River $24,434.00 0 $24,434.00
2008-09 NWTHC Geotechnical Services BIPed Sole Source procurement Hay River $24,976.00 0 $24,976.00
2004-05 PWS Hay River Band Office Renovation, Foundations Evaluation BIPed Request for Proposals Hay River $31,430.00 0 $31,430.00

Bid Summary

Summary of Bids on SOAs/RFPs/RFTs (Posted to Contract Registry)
Type # of Bids # of Successful Bids Value of Successful Bids
Standing Offer Agreements (SOA) 3 1 -
Requests for Proposals (RFP) 17 5 $184,416.00
Tenders (RFT) 17 5 $169,689.08
Request for Qualification (RFQ) 0 0 -
Totals 37 11 $354,105.08

Bids Published on Contract Reporting Website
Fiscal Year Procurement Status Bid or Contract Price
2018-19 Merlyn Carter Airport Surficial Drainage (0000002983) Successful $86,194.00
2018-19 Culvert Stream Survey (0000002540) $190,690.00
2017-18 Topographic Surveys - Dempster Highway (No. 8) (0000001535) $89,442.90
2016-17 Topographic Surveys - Dempster Highway (No. 8) (0000001155) $163,174.00
2015-16 Preliminary Survey and Quantity Calculations Services at Dempster Highway (No.8) (SC447880) Successful $52,275.00
2014-15 Topographic Survey - Liard Highway (SC440285) $49,252.00
2012-13 Technical Services - Satellite and GPS Collar Data Analysis (PM013401) -
2011-12 Thomas Simpson & Bompas Schools Topographic Surveying (SC793545) Successful $9,800.00
2011-12 Hay RIver Area Surveying (SC793369) $13,650.00
2011-12 Environmental Services (SO428081) -
2011-12 Environmental Services (SO050869) Successful -
2011-12 2011 Environmental Study (PM011931) $20,000.00
2010-11 Valuation of Salvageable Material - Treminco / Ptarmigan Mine Site (SC793152) -
2010-11 Topographic survey for TWCC (SC792879) $15,690.00
2010-11 RFP - Airport Air Terminal Building/Garage Drainage (SC792754) -
2010-11 Geotechnical Investigation for Health Centre & PWS Mainenance Shop (SC793132) -
2009-10 Wood Marshalling Yard Model (PM008109) Successful $34,187.00
2009-10 Preliminary Survey and Quantity Calculations (SC792126) $135,550.00
2009-10 Environmental Site Assessments Phase - I/II (PM008200) -
2009-10 Consulting/Engineering Services (SC792180) -
2008-09 Topographic Surveying-Various Culvert Sites (SC791952) Successful $74,500.00
2008-09 Princess Alexandra School Drainage (SC791360) Successful $20,295.00
2007-08 Structural Study (SC791286) $19,380.00
2007-08 Prospectors Training Course (PM004945) -
2007-08 Hay River Airport Geotechnical Investigation & Engineering Review (SC791701) -
2007-08 Fort Smith Airport Sewage System Study (SC791011) Successful $12,310.00
2007-08 Chief T'selehye School Topographic Survey (SC791603) Successful $10,200.00
2007-08 As And When Pit/Stockpile Survey, Design Modification and Quantity Calculations (SC791459) Successful $22,914.08
2007-08 2007 Survey Equipment Supply Program (PM005251) $12,480.50
2006-07 Topographic Surveys (SC791155) $160,000.00
2006-07 ATB Tanker-Parking Pad Repair (SC403176) -
2005-06 Trout Lake Sewage/Solid Waste Site Investigation (CT100129) -
2005-06 Preliminary Survey and Quantity Calculations (CT100203) -
2005-06 Charter Community of FGH - New Sewage Lagoon (PM002263) -
2004-05 Hay River Band Office Renovation, Foundations Evaluation (CT041520) Successful $31,430.00
2004-05 Fire Panel Replacement, South Mackenzie Correctional Centre (SMCC) (CT041526) -
2004-05 Chief Lamalice Assembly Building Foundations Evaluation (CT041522) -

Events

  • July 19, 2019 11:46 a.m. (MDT) - Awarded tender for 0000002983 - Merlyn Carter Airport Surficial Drainage
  • March 18, 2019 4:36 p.m. (MDT) - Bid on 0000002983 - Merlyn Carter Airport Surficial Drainage
  • Aug. 14, 2018 12:15 p.m. (MDT) - Bid on 0000002540 - Culvert Stream Survey

Log in

Register new account

Please create an account to use the extra features of this website.