CARE SSE Exterior and Interior Repairs Client 7031 Fort Good Hope NT
Event/Procurement ID: PM016888
This procurement
closed
Description
Materials is to be delivered prior to March 31, 2015. 1-Level the entire house, ensure all foundation components are level and stable. Replace any foundation components that are water damaged or acceptable for the intended use. 2-Remove the entire roof shingles, roof flashings, roof vent and chimney flashings. 3-Remove any water damaged roof sheeting’s and install new sheeting of the same thickness to replace the damaged plywood. Check and repair/replace any roof framing members that are rotten or water damaged 4-Install a new layer of 1/2” Oriented Strand Boards suitable for roofing over the entire roof. 5-Remove the entire existing wood fascia and all plywood soffit throughout. 6-Replace any rafter tails that are water damaged or rotten. 7-Install new wood fascia and soffit throughout. 8-Stain all new fascia and all soffit with 2 coats of solid color exterior stain, color white. All the staining shall take place before the installation and all sides of the fascia and soffit have to be stained. 9-Install a 36” strip of Ice and Water Shield membrane at the bottom of the roof on both side. 10-Install a layer of 15 lb. black felt roofing paper to the remaining of the entire roof. 11-Install new aluminum roof edge throughout. Color white. 12-Install all new roof flashings throughout. 13-Re install all chimneys. 14-32: Please refer to scope of work.
Details
- Published:
- Fiscal Year:
- Buyer:
- NWT Housing Corporation
- BIP Locations:
- Fort Good Hope (Sahtu)
- BIP Applies:
- Yes
- AIT Applies:
- Yes
- Security Required:
- Yes
- Process:
- Request for Tenders
- Method:
- Open (Competitive)
- Procurement Type:
- Construction
- Category:
- Building Construction General
- Closing:
- Status:
- Awarded
- Advertisement:
- View details
- Source Link:
- This tender was scraped from a GNWT Contract System that is no longer online.
- Last checked:
- n/a
Posted Bids (3 bids)
Bidder | Status | Bid Price | NWT Adjustment | NWT/Local Adjustment | Adjusted Bid Price | Contract Price |
---|---|---|---|---|---|---|
Northbound Contractors Ltd. | Successful | $89,900.00 | $39,900.00 | $50,000.00 | $73,915.00 | $89,900.00 |
TDJ Mechanical Services Ltd. | $96,000.00 | $48,000.00 | $48,000.00 | $79,200.00 | -- | |
Tee Jay Contracting Inc. | $98,200.00 | $40,000.00 | $58,200.00 | $80,560.00 | -- |
Related Contracts
Fiscal Year | Contract # | Supplier | BIP Status | Supplier Location | Original Value | Change Orders | Change Value | Final Value |
---|---|---|---|---|---|---|---|---|
2014-15 | CT441226 | Northbound Contractors Ltd. | BIP Registered | Colville Lake | $89,900.00 | -- | -- | $89,900.00 |