2012-13 Supply, Ship & Erect House Repairs for CARE Client #5427
Contract ID: SC580427
Status
This contract was awarded by NWT Housing Corporation to Northbound Contractors Ltd..
The contract is complete.
There were 0 change orders.
Dates
- Start Date
- Oct 16, 2012
- Current End Date
- Mar 29, 2013
- Potential End Date
- Unknown
Description
Tender to include but not be limited to the following; repairs water damaged insulated main floor, remove and re-construct the bathroom and water storage tank room built up floor, construct a water containment area c/w a floor drain, re-install the water storage tank and water pressure system c/w hot water heater, re-construct water damaged interior walls, re-install bathroom fixtures and door, replace floor tile c/w sealer and wax, install metal nosing on exposed floor elevation differences, paint repaired ceilings and walls c/w trim, install a new fuel oil storage tank c/w tank stand modifications, paint same.
Details
- Fiscal Year:
- Buyer:
- NWT Housing Corporation
- Contract Dates:
- to
- Supplier:
- Northbound Contractors Ltd.
- Supplier BIP Status:
- BIP Registered
- Supplier Location:
- Colville Lake
- Original Value:
- $39,900.00
- Change Orders:
- --
- Current Value:
- $39,900.00
- Community:
- Deline (Sahtu)
- Process:
- Request for Tenders
- Method:
- Open (Competitive)
- Procurement Type:
- Construction
- Category:
- Building Construction General
- Contract Added:
- Jan. 24, 2018
- Source:
- Contracting Report