M&I PH Unit 17/18 SSE INTERIOR AND EXTERIOR REPAIRS, Fort Good Hope, NT

Contract ID: SC441236
Status

This contract was awarded by NWT Housing Corporation to TDJ Mechanical Services Ltd..

The contract is complete.

There was 1 change order.

Dates
A rectangle of color grey representing the period of progress A circle of color green representing the start of progress A circle of color red representing the end of progress
Start Date
Jan 06, 2015
Current End Date
Jul 30, 2015
Potential End Date
Unknown

Description

Note: Materials is to be delivered to the project loacation in Fort Good Hope prior to March 31, 2015. 1-Remove the existing front landings and stairs. 2-Build and install two new landings complete with stairs and railings. The new landings shall be the same size as the original landings. 3-Stain all lumber with one coat of exterior Latex stain color(Blue Nose) # CC-800 by Benjamin Moore Paint prior to assemble any components. All railing upright parts shall be stained with 2 coats of exterior stain color white. Once the entire landing and stairs have been completely built a second coat of stain can be applied. All cuts have to be stained. 4-Pressure treated wood pads complete with treated cuts have to be installed on the ground to support any posts and stair case. Pads shall be built using 3 layers of pressure treated 2 x 6 lumber only. Pads size shall be a minimum of 24” by 24”. 5-Check and repair all fascia and soffit components. Stain all to match existent. 6-Stain all corner boards with two coats of exterior stain to match existent. 7-Repair all existing skirting, install new were skirting is missing and stain all with two coats of exterior stain throughout. Color to match existing. 8-Replace all exterior lights with new light fixture matching existing light fixtures. 9-Check and ensure all exterior receptacles are operating as intended, ensure weather proof covers are in place. 10-Repair and make good all eaves through system troughout. 11-Repair and re install the attic access covers. 12-Remove all exterior doors complete with jamb. 13-Install new exterior doors complete with new door jamb, door hardware and dead bolt where applicable. 14-60: Please refer to contract documents.

Details

Fiscal Year:
Buyer:
NWT Housing Corporation

Contract Dates:
to

Supplier:
TDJ Mechanical Services Ltd.
Supplier BIP Status:
BIP Registered
Supplier Location:
Fort Good Hope

Original Value:
$90,800.00
Change Orders:
$7,140.00 (1 change)
Current Value:
$97,940.00

Community:
Fort Good Hope (Sahtu)
Process:
Request for Tenders
Method:
Open (Competitive)
Procurement Type:
Construction
Category:
Building Construction General

Contract Added:
Jan. 24, 2018
Source:
Contracting Report

Change Orders (Contract Amendments)

Fiscal Year Change Order Number Change Order Value
2015-16 1. CA441236-1 $7,140.00

* The GNWT only publishes combined change order values so when there are multiple change orders in a fiscal year it is not possible to determine the reason or value for individual change orders.

Contract Disclosure Report Entries

Fiscal Year Report Period Start Report Period Ending Source
2014-15 April 1, 2014 March 31, 2015 Report
2014-15 Jan. 6, 2015 July 30, 2015 Report