MHU M&I SSE UNIT #3024001, Fort Good Hope, NT,

Contract ID: SC441242
Status

This contract was awarded by NWT Housing Corporation to Green Tree Enterprises Ltd..

The contract is complete.

There was 1 change order.

Dates
A rectangle of color grey representing the period of progress A circle of color green representing the start of progress A circle of color red representing the end of progress
Start Date
Feb 12, 2015
Current End Date
Aug 12, 2015
Potential End Date
Unknown

Description

Please refer to tender documents for scope and other terms & conditions: 1-Level the entire unit. 2-Ensure all foundation pads are installed level and are stable. 3-Ensure all foundation blocks and wedges are installed as per specifications and are operating as intended. 4-Check and replace any deteriorated foundation wood components. 5-Repair the existing plywood skirting and ensure it is a minimum of 6” above the ground level. 6-The skirting shall be framed with 2 x 4 lumber installed 16” on center and braces provided. 7-Check and repair any skirting plywood that is damaged. 8-Stain with 2 coats of exterior stain all skirting plywood. Stain color to be similar to the original color. 9-Install a layer of R-12 insulation within the entire interior cavity of the skirting. The insulation shall be secured to the skirting with staples. 10-Install a layer of 6 Mil. poly over the entire skirting insulation. The poly should be installed with a minimum of 16” lying on the ground and a minimum of 12 inches to be attached to the belly bag of the mobile unit. 11-Build and install an insulated door within the skirting. Check with the housing Association for the location of the door. 12-Build and compact a gravel pad with a minimum thickness of 16” above surrounding ground area. 13-The pad dimensions shall be 14 feet wide by 20 feet deep to accommodate a 10 feet by 16 feet wood storage shed. 14-Build and install a 10 feet by 16 feet storage shed as per drawing and specifications. See annex #1 for details. 15-Check the condition of the existing house landing, remove any deteriorated lumber and replace with new lumber. 16-Remove the existing stair case completely. 17-Please refer to tender documents for detailed scope of work.

Details

Fiscal Year:
Buyer:
NWT Housing Corporation

Contract Dates:
to

Supplier:
Green Tree Enterprises Ltd.
Supplier BIP Status:
BIP Registered
Supplier Location:
Fort Good Hope

Original Value:
$99,000.00
Change Orders:
$200.00 (1 change)
Current Value:
$99,200.00

Community:
Fort Good Hope (Sahtu)
Process:
Request for Tenders
Method:
Open (Competitive)
Procurement Type:
Construction
Category:
Building Construction General

Contract Added:
Jan. 24, 2018
Source:
Contracting Report

Change Orders (Contract Amendments)

Fiscal Year Change Order Number Change Order Value
2015-16 1. CA102719 $200.00

* The GNWT only publishes combined change order values so when there are multiple change orders in a fiscal year it is not possible to determine the reason or value for individual change orders.

Contract Disclosure Report Entries

Fiscal Year Report Period Start Report Period Ending Source
2014-15 April 1, 2014 March 31, 2015 Report
2014-15 Feb. 12, 2015 July 31, 2015 Report