2012 SCP - Hay River Reserve Road Culvert Installation and Drainage Works

Contract ID: SC793974
Award dates for non-competitive contracts are not disclosed by the GNWT. Dates below are based on the publishing/tabling of the appropraite Contracting Report.
Status

This contract was awarded by Transportation to Rowe's Construction Ltd..

The contract is complete.

There were 0 change orders.

Dates
A rectangle of color grey representing the period of progress A circle of color green representing the start of progress A circle of color red representing the end of progress
Start Date
Jun 18, 2012
Current End Date
Jun 25, 2012
Potential End Date
Unknown

Description

Installation of 600mm culvert pipes across the road and the driveway including some ditch cleaning works at the locations as determined by the Engineer. Culverts and granular material will be supplied from DOT. Traffic control is required and all measures are to be approved by the Engineer. Contractor is required to supply Equipment and labour as per the As & When' agreement per SO050936.

Details

Fiscal Year:
Buyer:
Transportation

Contract Dates:
to

Supplier:
Rowe's Construction Ltd.
Supplier BIP Status:
BIP Registered
Supplier Location:
Hay River

Original Value:
$30,000.00
Change Orders:
--
Current Value:
$30,000.00

Community:
Hay River Reserve (South Slave)
Process:
SOA Release (Master SOA: SO050936)
Method:
Selective (Prequalified)
This is a Standing Offer Agreement (SOA) Release, which means it has been contracted under the terms of an existing Standing Offer agreement. The GNWT does not generally track or disclose which agreement these releases are related to.However, in this case, we know the master agreement is SO050936.
Procurement Type:
Construction
Category:
Road Construction Services

Contract Added:
Jan. 24, 2018
Source:
Contracting Report

Contract Disclosure Report Entries

Fiscal Year Report Period Start Report Period Ending Source
2012-13 April 1, 2012 March 31, 2013 Report
2012-13 June 18, 2012 June 25, 2012 Report