Martin River Bridge Repairs

Event/Procurement ID: SC794693
This is a Standing Offer Agreement (SOA) Release, which means it has been award to the a supplier on an existing SOA Agreement and no tender was issued.

This procurement was awarded.

Description

Remove and replace 6 damaged structural steel bridge posts, 6 lengths of thrie-beam bridgerail, 1 transition beam, 3 lengths of W-beam guardrail, 3 pressure-treated guardrail posts and associated hardware.

Details

Published:
Fiscal Year:
Buyer:
BIP Locations:
Fort Simpson (Dehcho)
AIT Applies:
Yes

Process:
SOA Release (Master SOA: SO051054)
Method:
Selective (Prequalified)
Procurement Type:
Services
Category:
Road Maintenance
Status:
Awarded

Attachments

Filename Description Size Added
No files attached to this tender.
Note: You have to login to access attachments. For any questions about documents please contact the GNWT Contracts Portal.

Related Contracts

Fiscal Year Contract # Supplier BIP Status Supplier Location Original Value Change Orders Change Value Final Value
2013-14 SC794693 Rowe's Construction Ltd. BIP Registered Fort Simpson $26,375.14 -- -- $26,375.14